- By clara tj
- December 5, 2025
- Freight Forwarding, Logistics, Transport
Table of Contents
Exporting toys in bulk is a time-sensitive process, especially when demand surges before the holiday season. The Open Top FCL space availability for toys from China to Denmark has become a growing concern as ports face congestion and equipment shortages. Partnering with Top China Forwarder ensures consistent access to Open Top containers, efficient loading for oversized or irregular cargo, and guaranteed shipping schedules.
Why Open Top Containers Are Ideal for the Toy Industry
Toys such as large playsets, slides, or promotional displays often exceed the height limits of standard containers. Open Top FCL allows vertical loading with cranes or forklifts—perfect for manufacturers shipping assembled or bulky items.
| Container Type | Dimension (m³) | Best for | Loading Method | Availability |
|---|---|---|---|---|
| 20GP | 33.2 | Small boxes | Rear door | High |
| 40GP | 67.7 | Regular cartons | Rear door | Medium |
| 40HQ Open Top | 76.3 | Tall/bulky toys | Top crane | Limited |
| Flat Rack | Custom | Oversized cargo | Top/side | Low |
Due to strong retail demand in Europe, Open Top containers are often overbooked, making early reservations crucial for exporters.
👉 Secure your container allocation early → Send Inquiry
What Causes Open Top FCL Space Shortages?
Global supply chain congestion and regional surges in toy exports create frequent equipment imbalances.
Key reasons include:
- Increased holiday orders from Danish retailers.
- Carrier priority for high-yield standard containers.
- Limited Open Top container repositioning between Asian ports.
- Labor shortages delaying container turnaround.
Shippers must plan 3–4 weeks ahead to guarantee FCL space and avoid costly rollovers.
Typical Open Top FCL Freight Rates: China → Denmark
| Origin Port | Destination | Transit Time | Average Rate (USD) | Mode |
|---|---|---|---|---|
| Shanghai | Aarhus | 32–35 days | $4,300–$4,900 | Sea |
| Ningbo | Copenhagen | 33–36 days | $4,400–$5,000 | Sea |
| Shenzhen | Odense | 31–34 days | $4,200–$4,800 | Sea |
Rates fluctuate depending on seasonality, port congestion, and space availability. Working with Sea Freight experts ensures you receive priority bookings and carrier flexibility.
How to Secure Open Top FCL Space for Toy Exports
1. Book containers 3–4 weeks in advance.
Early commitment helps secure guaranteed Open Top slots before vessel capacity fills.
2. Use multi-carrier partnerships.
Top China Forwarder works with MSC, Maersk, COSCO, and CMA CGM to widen booking options.
3. Optimize packing dimensions.
Pre-measured pallets help maximize container volume and comply with European height restrictions.
4. Consider alternative container types.
For extremely oversized cargo, Flat Rack options may offer faster availability.
👉 Check weekly Open Top slot schedules → Send Inquiry
The Importance of Reliable Container Allocation
When space is scarce, delays can affect the entire toy supply chain. Danish importers depend on consistent arrivals to meet retail distribution deadlines.
Impacts of delayed space availability:
- Missed seasonal sales windows.
- Inventory overflow in China warehouses.
- Higher air freight expenses for urgent replenishments.
- Customer dissatisfaction due to stockouts.
Maintaining reliable Open Top FCL access is key to ensuring business continuity during peak export periods.
Comparing Shipping Methods for Toys
| Method | Cost | Transit | Ideal Cargo | Pros | Cons |
|---|---|---|---|---|---|
| Sea Freight | $$ | 30–35 days | Bulk toys | Cost-efficient | Longer transit |
| Air Freight | $$$$ | 5–7 days | Urgent shipments | Fast | Expensive |
| Rail Freight | $$$ | 18–22 days | Mid-volume cargo | Balanced | Limited routes |
| Door to Door | $$ | 30–35 days | End-to-end | Simplified | Slightly higher cost |
While Air Freight is fast, sea freight remains the most viable option for large toy volumes bound for Northern Europe.
Customs and Import Procedures for Toys into Denmark
Proper documentation ensures faster customs clearance and reduced detention fees.
| Document | Purpose | Issuer |
|---|---|---|
| Bill of Lading | Proof of shipment | Carrier |
| Packing List | Details of goods | Shipper |
| Commercial Invoice | Declares value | Exporter |
| CE Certification | Product compliance | Manufacturer |
| Certificate of Origin | Tariff classification | Chamber of Commerce |
Working with Customs Brokerage specialists guarantees smooth clearance through Danish customs.
👉 Avoid customs delays and fines → Send Inquiry
Managing Warehouse Space Before Loading
China’s major ports (Shanghai, Ningbo, and Shenzhen) often face high yard congestion. Storing cargo in off-dock Warehouse facilities before container allocation improves efficiency.
Benefits of pre-warehousing:
- Avoids terminal storage charges.
- Allows easier pre-inspection of toy packaging.
- Ensures quick container loading once available.
For exporters managing multiple SKUs, flexible warehousing can also improve consolidation speed.
Cost Breakdown for Open Top FCL Shipments
| Cost Element | Range (USD) | Description |
|---|---|---|
| Freight Charge | $4,300–$5,000 | Mainline carrier cost |
| THC & Origin Fee | $150–$200 | Terminal handling in China |
| Drayage & Loading | $80–$150 | Trucking to port |
| Customs Clearance | $100–$180 | Export paperwork |
| Insurance | $50–$120 | Cargo protection |
| Storage (if delayed) | $10–$30/day | Avoidable with planning |
With proper scheduling, exporters can cut total costs by 15–20%. Using Cargo Insurance also safeguards against potential delays or weather-related risks.
Case Study: Toy Exporter Secures Guaranteed Open Top Space
A Shenzhen-based toy manufacturer exporting large playground sets faced repeated rollovers due to limited Open Top container availability. By collaborating with Top China Forwarder:
- Advanced booking secured 6 Open Top FCLs within 10 days.
- Freight rate locked before market surge.
- Smooth customs clearance and 33-day delivery to Aarhus.
- 0 demurrage or detention fees.
The proactive planning approach saved both time and $2,000 in additional costs.
Conclusion:
The Open Top FCL space availability for toys from China to Denmark depends on early booking, multi-carrier coordination, and reliable forwarding partners. By choosing Top China Forwarder, toy exporters gain guaranteed space, cost stability, and streamlined delivery to key Danish markets—ensuring every shipment reaches retailers on time.
Ask For a Quote
Get your Open Top FCL quote within 24 hours. Enjoy guaranteed container space, flexible scheduling, and dedicated customer support for your next toy shipment.
FAQ
Q1: Why are Open Top containers in short supply?
Because carriers prioritize high-demand standard containers, especially during peak export seasons.
Q2: What’s the best time to book for toy exports?
Book at least 3–4 weeks before departure for guaranteed space.
Q3: Can I combine Open Top and Dry FCL in one shipment?
Yes, it’s common to optimize costs and loading flexibility.
Q4: How long is shipping from China to Denmark?
Approximately 31–35 days depending on port and routing.
Q5: Are Open Top FCL shipments more expensive?
Slightly higher due to special equipment and limited space.
Q6: Does Top China Forwarder handle customs in Denmark?
Yes, full Import Service is available for Danish importers.

