- By clara tj
- October 11, 2025
- Freight Forwarding, Logistics
Table of Contents
Knowing how to ship medical equipment from China to Europe is critical for ensuring regulatory compliance, fast delivery, and patient safety. Any errors in documentation or shipping can lead to delays, fines, or shipment rejections. Partnering with Top China Forwarder allows importers to meet all legal requirements and choose the most efficient logistics solutions.
Why Medical Equipment Shipping Requires Special Attention
Medical devices and equipment are highly regulated in the EU. They often require:
- Precise temperature control
- Sterile packaging
- CE marking or equivalent certifications
- Strict documentation for customs clearance
These requirements make medical shipments more complex than general cargo. Therefore, selecting the right shipping method and ensuring full regulatory compliance is essential.
What Export Documents Are Required for Medical Equipment?
| Document Name | Purpose | Issued By |
|---|---|---|
| Commercial Invoice | Declares the value of goods | Exporter |
| Packing List | Shipment details, quantities, and weight | Exporter |
| Bill of Lading / Air Waybill | Confirms transport | Carrier |
| Certificate of Origin | Determines tariffs and duties | Chamber of Commerce |
| Export Declaration | Required for China customs | Exporter / Customs Agent |
| CE Marking Certificate | Confirms EU compliance | Manufacturer |
| Import Declaration (EU) | Required for EU customs clearance | Importer / Broker |
| Product Registration / MDR | Required for regulated medical devices | Manufacturer / Importer |
👉 Work with Customs Brokerage to ensure all documents are correct and complete.
Which Shipping Method Works Best for Medical Equipment?
| Shipping Method | Transit Time | Cost (Est.) | Suitable For | Pros | Cons |
|---|---|---|---|---|---|
| Air Freight | 3–7 days | $6–$12/kg | High-value and time-sensitive equipment | Fast, secure, temperature control | Expensive |
| Express Courier | 3–5 days | $8–$15/kg | Small devices, urgent shipments | Fastest option, door-to-door | High cost |
| Rail Freight | 18–25 days | $2–$5/kg | Non-urgent bulk shipments | Reliable, cost-efficient | Slower than air |
| Sea Freight | 30–40 days | $0.5–$2/kg | Non-urgent, large equipment (e.g., MRI) | Cheapest for heavy cargo | Slow, requires more planning |
👉 Compare Air Freight, Sea Freight, and Rail Freight options to select the best fit.
Transit Time from Major Chinese Cities to European Hubs
| Origin Port / Airport | Destination (Europe) | Mode | Estimated Transit Time |
|---|---|---|---|
| Shanghai (PVG) | Frankfurt (FRA) | Air Freight | 3–5 days |
| Shenzhen (SZX) | Paris (CDG) | Air Freight | 4–7 days |
| Chongqing | Hamburg | Rail Freight | 18–22 days |
| Ningbo | Rotterdam | Sea Freight | 30–40 days |
Transit time depends on carrier availability, customs processing, and product classification.
Temperature and Handling Requirements for Medical Shipments
Many medical devices are sensitive to temperature or humidity. For example:
| Equipment Type | Temperature Range | Special Handling Required |
|---|---|---|
| Diagnostic kits (PCR) | 2–8°C | Cold chain storage and delivery |
| Vaccination devices | 2–25°C | Temperature monitoring |
| MRI / Imaging equipment | Ambient | Shock protection & crating |
| Disposable medical tools | Ambient | Sterile packaging, sealing |
👉 Consider using Warehouse services for pre-shipment inspection and cold storage.
CE Marking and Regulatory Compliance
Before importing into the EU, all medical devices must comply with the EU Medical Device Regulation (MDR):
- CE marking is mandatory for most devices.
- The product must have EU Declaration of Conformity.
- High-risk devices require notified body assessment.
- Packaging and labeling must meet MDR standards.
| Device Class | Example | CE Requirements |
|---|---|---|
| Class I | Bandages, stethoscopes | Self-certification |
| Class IIa/IIb | Infusion pumps, imaging equipment | Notified body assessment required |
| Class III | Pacemakers, implantable devices | Strict review, EU registration |
👉 Import Service can support regulatory compliance and labeling.
Customs Clearance Process for Medical Equipment in Europe
- Submit all export documents from China.
- Provide CE certificates and MDR compliance documents.
- Pay duties and VAT based on HS codes.
- Customs inspection if required (especially for Class II/III devices).
- Final delivery to hospitals, clinics, or distributors.
| Step | Responsible Party | Typical Timeline |
|---|---|---|
| Entry submission | Forwarder / Importer | 1–2 days |
| Customs review | EU customs authorities | 1–3 days |
| Duties & VAT payment | Importer | 1 day |
| Cargo release | Customs | 1 day |
👉 A Door To Door service can minimize customs delays.
Duties and Taxes for Medical Equipment in the EU
| Equipment Type | HS Code | Average Duty | VAT Rate |
|---|---|---|---|
| Diagnostic devices | 9027 | 0–5% | 0–20% |
| Surgical instruments | 9018 | 0–5% | 0–20% |
| Monitoring equipment | 9019 | 0–5% | 0–20% |
| MRI / X-ray | 9022 | 0–5% | 0–20% |
Some medical devices may be eligible for duty exemptions under EU health policies.
Packaging and Labeling Requirements
Medical equipment must be:
- Packed securely to avoid damage
- Labeled in compliance with MDR and CE marking rules
- Marked with country of origin, weight, and handling instructions
- Stored in temperature-controlled conditions if required
| Label Information | Required | Example |
|---|---|---|
| CE Mark | ✅ Yes | CE 0123 |
| Manufacturer Details | ✅ Yes | “ABC Medical Co., China” |
| Temperature Limits | ✅ Yes | “Store at 2–8°C” |
| Handling Instructions | ✅ Yes | “Fragile / Keep Upright” |
👉 Cargo Insurance is strongly recommended for high-value shipments.
Real Case Example: Shipping MRI Machines from Shanghai to Germany
A Chinese manufacturer exported MRI machines to Germany using sea freight.
- Shipment weight: 18 tons
- Pre-shipment inspection + insurance
- Export documentation completed 7 days before departure
- Sea Freight from Ningbo to Hamburg: 36 days
- Customs clearance: 3 days
✅ Result: Successful delivery to hospital within 45 days, no regulatory issues.
Conclusion:
Knowing how to ship medical equipment from China to Europe means more than just booking a shipment. It involves understanding CE certification, MDR compliance, customs documentation, temperature requirements, and the best shipping methods. Partnering with an experienced freight forwarder ensures your shipments meet regulations, arrive on time, and protect the integrity of medical devices.
Ask For a Quote
Need expert help shipping medical equipment?
✅ Get a quote in less than 24 hours.
🚀 Access fast, compliant freight solutions.
📦 Protect your shipments with full documentation support.
FAQs
Q1: What documents are required to ship medical equipment to Europe?
You need a commercial invoice, packing list, bill of lading or air waybill, CE certificate, MDR compliance, and import declaration.
Q2: How long does it take to ship medical devices to Europe?
Express and air freight take 3–7 days, rail about 18–25 days, and sea freight 30–40 days.
Q3: Do all medical devices need CE marking?
Yes, most devices require CE marking under EU MDR regulations, especially for Class II and III devices.
Q4: Are there import duties on medical equipment?
Duties range from 0–5%, and some essential medical devices may qualify for duty exemptions.
Q5: How can I maintain temperature control during transit?
Use cold chain logistics, data loggers, and professional packaging solutions.
Q6: What shipping method is best for urgent deliveries?
Air freight or express courier is best for urgent and high-value medical shipments.

